Description
3 Wire Pt100 RTD Probe – 6 Inches Long x 3/16″ Diameter Stainless Steel Sheath with 40 Inches (1 Meter) Long Lead Wire
3 Wire Pt100 RTD Probe – 6 Inches Long x 3/16″ Diameter Stainless Steel Sheath with 40 Inches (1 Meter) Long Lead Wire
- Probe Length – 6 Inches – Probe Diameter 3/16″ (.188″ or 4.57 mm)
- Temperature Operating Range is -90 to 500 F (-70 to 260 C)
- 3 Wire Design with a Pt100 (Platinum 100 ohm) Class A accuracy element encased with high purity mineral insulation to provide temperature stability.
- Probe Transitions from the rigid stainless steel sheath with a high performance epoxy provides to 40″ inches (1 Meter) of PFA (Plastic Fluoropolymer) 500 F (260 C) insulated wire.
- Wire Leads are 3 PFA insulated conductors with 26 Gage Stranded (7/34) nickel plated copper with an overall outside jacket of PFA and .072″ diameter.
- Instrument Connection – stripped wire leads
- EvoSensors Part Number- P3A-TBSX-188-PX-6-PFXX-40-STWL