Description
Fast Response Exposed Element RTD Sensor 2 Wire Design Pt100 Class B Accuracy 36 Inch Long Leads
Fast Response Exposed Element RTD Sensor 2 Wire Design
- 2 Wire Pt100 (Platinum 100 Ohm) RTD sensor with 36″ inches (3 ft) of 2 Conductor (PFA) insulated 26 gage stranded lead wire with stripped ends
- Temperature Operating range -90 to 500°F (-70 to 260°C)
- Exposed RTD element with a transition to 500°F rated epoxy to the lead wire.
- Wire Leads are 36″ inches (3 ft) long with a 500°F (260°C) rated PFA insulation.
- Wire Construction is a 2 wire twisted design made with 26 stranded (7/34) nickel plated copper. Both are insulated with PFA with one lead colored red and the other white ith a white outside jacket.
- overall jacket diameter
- The sensor provides a fast response and minimizes electrical interference in Power Electronics, Transformers, and Motor applications.
- EvoSensors Part Number: P2B-TF22-26S-PX-0.08-PFXX-36-STWL
- Location: C-2-1
Consider the following Accessories to Complete your Sensor System