Glass Braid Insulated Thermocouple – Type K 20 Gage Solid Wire with 80 Inch Long Leads Online

$12.00

SKU: US-8508233291 Categories: ,
Description

Description

Glass Braid Insulated Thermocouple – Type K 20 Gage Solid Wire with 80 Inch Long Leads

Glass Braid Insulated Type K Exposed Thermocouple provides a Rugged and Fast Response Design with 80 inches of 20 Gage Solid Lead Wire 

  • Temperature Operating range is 32 to 900°F (0 to 482°C)
  • Exposed Thermocouple junction made from High Accuracy SLE thermocouple grade wire with a weld bead of approximately 0.045″ (1.14 mm) diameter. Provides the opportunity for both Rugged applications and Fast response time in the 1.5 second range.
  • Wire Leads are 6.6 ft (80 inches or 2 meters) of high High Temperature fiberglass 20 gage solid wire with a 900°F (482°C) rating
  • Wire Construction is 2 bare wires each measuring 0.032″ (0.81 mm) in a parallel construction with the wires individually insulated with Fiberglass Braiding along with an outside jacket of fiberglass braid. The overall outside diameter is a nominal .060″ x .095″.
  • Color Code is ANSI with a yellow positive nickel chrome wire a red negative nickel aluminum thermocouple wire and overall brown with a yellow trace. 
  • Instrument Connection is stripped wire leads
  • Excellent temperature solutions for Heat Treating, Metal Processing, Aerospace, Optics, and overall Research and Testing along with many other industries.
  • EvoSensors Part Number K1X-WBWX-20G-EX-0.25-FGXX-80-STWL
  • Location: D-4-9

Consider the following Accessories to complete your Sensor System

   

Shipping & Delivery

We accept returns on non-sale items that are in original packaging, unused, and unwashed within 30 days of receipt. Please follow our returns/exchanges process below. If items do not meet our requirements for return, they will be shipped back to you in lieu of a refund. Shipping and handling charges are non-refundable (exceptions may apply).

Returns & Exchanges Process: If item(s) fit within our returns guidelines found in the Returns. Please allow 7-10 business days for the credit to appear on your account after your return is processed.