Description
Glass Braid Insulated Thermocouple – Type K 30 Gage with 80 Inch Long Leads and Stripped Ends
Fiberglass Braid Insulated Thermocouple – Type K 30 Gage with 80 Inch Long and Stripped Ends
- Temperature Range is 32°F to 900°F (0 to 482°F)
- Micro-Sized thermocouple bead is 0.029″ (0.7 mm) diameter.(approx. thickness of credit card) provides the opportunity for precise placement.
- Response Time – Less than 1 Second
- Wire Leads are 80″ Inches (2 meters or 6.7ft)
- Wire Construction – 30 gage solid 0.010″ (0.25 mm) bare wire is a 2 wire parallel design with the wires individually insulated with Fiberglass Braiding along with a Fiberglass outside jacket.
- The overall outside diameter is a nominal .037″ x .050″.
- Instrument Connection – stripped wire leads
- Applications and Industries include Heat Treating, Metal Processing, Aerospace, Optics, and overall Research and Testing along with many other industries.
- EvoSensors Part Number: K1X-WBWX-30G-EX-0.25-FGXX-80-STWL
Consider the following Accessories to complete your Sensor System