Type J Thermocouple Exposed Weld Bead Junction with 24 Gage Glass Braid Insulated Wire 80 Inch Long Leads on Sale

$10.80

SKU: US-8512499531 Categories: ,
Description

Description

Type J Thermocouple Exposed Weld Bead Junction with 24 Gage Glass Braid Insulated Wire 80 Inch Long Leads

Type J Thermocouple Exposed Bead Weld Junction with 24 Gage Solid Wire Glass Braid Insulated 80 Inch Long Leads

  • Temperature Operating range is 32° to 900°F (0 to 482°C)
  • Exposed Fast Response thermocouple junction bead is .040″ (1mm) diameter with approximately 1.25 Seconds
  • Lead Wire is 24 gage solid 0.020″ (0.51 mm) bare wire in a 2 wire parallel construction with the wires individually insulated with fiberglass braid and overall jacket of fiberglass braid 
    • Outside wire jacket diameter is approximately .050″ x .080″.
  • Instrument Connection is stripped wire leads
  • Application and Industries include Composite and Plastics Processing, Aerospace, and overall Research and Testing along with many other industries.
  • EvoSensors Part Number: J1X-WBWX-24G-EX-0.25-FGXX-80-STWL
  • Location: E-3-2

Consider the following Accessories to complete your Sensor System

   

Shipping & Delivery

We accept returns on non-sale items that are in original packaging, unused, and unwashed within 30 days of receipt. Please follow our returns/exchanges process below. If items do not meet our requirements for return, they will be shipped back to you in lieu of a refund. Shipping and handling charges are non-refundable (exceptions may apply).

Returns & Exchanges Process: If item(s) fit within our returns guidelines found in the Returns. Please allow 7-10 business days for the credit to appear on your account after your return is processed.