Type T Thermocouple Extension Cable 10ft Long Leads with Miniature Male and Female Connector Termination For Cheap

$20.00

SKU: US-4158683349124 Categories: ,
Description

Description

Type T Thermocouple Extension Cable 10ft Long Leads with Miniature Male and Female Connector Termination

Type T Thermocouple Extension Cable 10 ft Long with Miniature Male and Female Connector Termination

  • 10 ft of Type T of 24 Gage solid wire provides an excellent combination of strength and flexibility.
  • Wire Temperature Operating Range -328 to 500 F (-200 to 260 C)
  • Miniature Male and Female Connector attached with a Temperature Rating of -50 to 400 F (-45 to 200 C) and Stripped Leads.
  • Provides a Fast, Easy to Use and Reliable extension of the thermocouple signal from the sensor to your instrumentation
  •  EvoSensors part number T1X-CAPF-24G-MPCF-10FT-MPCX
  • Location C-5-18
Shipping & Delivery

We accept returns on non-sale items that are in original packaging, unused, and unwashed within 30 days of receipt. Please follow our returns/exchanges process below. If items do not meet our requirements for return, they will be shipped back to you in lieu of a refund. Shipping and handling charges are non-refundable (exceptions may apply).

Returns & Exchanges Process: If item(s) fit within our returns guidelines found in the Returns. Please allow 7-10 business days for the credit to appear on your account after your return is processed.